When the concrete strength of a structure does not meet the design requirements during rebound testing on a construction site, several potential causes should be investigated. These include: 

1.  Poor Early-Stage Curing or Insufficient Compaction

   Inadequate curing in the early stages or improper vibration during concrete placement can lead to insufficient concrete strength. 

2.  Failure to Achieve Design Strength in Standard 28-Day Tests   

   If the standard 28-day test results fall short of the design mix strength values, it could indicate a problem with the mix design or execution. 

3.  Rapid Slump Loss of Concrete Mix   

   Quick slump loss can make the mix difficult to pour after arriving at the site, often leading to the addition of water, which compromises concrete strength. 

4.  Excessive Batch Size for Small Components   

   When pouring small structural components (e.g., structural columns) with excessively large batches (e.g., 5 cubic meters or more), prolonged unloading times can cause a reduction in the strength of later-poured concrete. 

5.  Decline in the Quality of Raw Materials   

   Issues with raw materials can negatively impact concrete strength, such as: 

   – High mud content in sand and aggregate 

   – Excessive shale particles in coarse aggregate 

   – Overly coarse fly ash 

   – Reduced water-reducing efficiency of admixtures without compensatory dosage adjustments 

   – Low cement strength 

Recommendations for Resolution 

–  Identify and Address Root Causes   

  Investigate and rectify issues related to curing, mix design, material quality, and pouring practices. 

–  Evaluate and Strengthen Weak Components   

  Conduct strength assessments of affected structural components and apply reinforcement or repairs where necessary. 

–  Improve Quality Control Measures   

  Enhance material inspection protocols and ensure strict adherence to mix design and placement standards. 

–  Monitor Workmanship and Training   

  Provide additional training to construction personnel to minimize errors during curing, mixing, and pouring. 

–  Collaborate with Suppliers   

  Work closely with concrete suppliers to maintain consistent quality of raw materials and ensure proper admixture performance. 

By systematically addressing these factors, the structural integrity and safety of the construction project can be restored, ensuring compliance with design requirements.

Treatment Methods

1.  Carbonation Depth Exceeds Standards   

   If the carbonation depth of concrete exceeds 2mm within six months, or 3mm for concrete aged over six months, it indicates poor early-stage curing or insufficient compaction, which is the responsibility of the construction unit. Concrete poured during winter often shows a significant increase in carbonation depth.

2.  Improve Concrete Mix Design   

   The concrete mix should be adjusted to ensure that the standard 28-day strength meets or exceeds the designed strength value, which should be the design strength plus 1.645 times the standard deviation (i.e., the strength should be higher to account for variations in material performance).

3.Additive Testing for Each Truckload

   Each truckload of admixture should be tested, and the slump loss must meet the required standards.

4. Control Delivery Volume for Small Components

   When pouring small components like structural columns, if the pouring rate is slow, the delivery volume per truck should be kept between 3 to 5 cubic meters and the truck should not be fully loaded.

5. Identify and Correct Raw Material Quality Issues 

   Identify which raw material has quality problems and immediately make the necessary corrections.